Villa 24 is a semi detached home at AMIRAL by ZOROM, set in a peaceful residential area of La Nucía. It is the last villa in the block facing Benidorm Bay and combines Mediterranean views with generous terraces and a design created for enjoying the Costa Blanca throughout the year. Elian’s British School La Nucía and Camilo Cano Sports City are approximately 5 minutes away by car.
The contemporary architecture brings together natural stone walls, veined porcelain stoneware cladding and large windows that draw light into the interiors. A landscaped roof with Mediterranean planting forms part of the landscape concept and is designed to contribute to the home’s thermal comfort.
The upper floor contains the living and dining area and an open Alvic kitchen, fitted according to the quality specifications with Dekton Aeris worktops and Siemens appliances. From here, the home opens onto a 56.05 m2 pool terrace, with space to enjoy the sun beside a private swimming pool measuring 20.80 m2 at the water surface. This floor also has one bedroom and a full bathroom, as well as a 19.35 m2 open terrace next to the bedroom.
The lower floor offers two bedrooms and two bathrooms alongside an outdoor relaxation area comprising a covered terrace of 14.60 m2 and an open terrace of 32.23 m2. The terraces total 122.23 m2, providing different places to gather as a family or relax outdoors. The open covered parking area measures 96.07 m2, and the plan shows space for 3 vehicles.
The villa features water based underfloor heating connected to a Kosner Aquaris MD aerothermal system, ducted air conditioning and mechanical ventilation with heat recovery. Planned finishes include Saloni flooring and K Line aluminium window frames with thermal break. The private plot measures 267.23 m2 and the two residential floors have a combined built area of 145.55 m2. The total of 363.85 m2 stated on the plan also includes the parking area and terraces.
Price 656,217 euros, excluding VAT and purchase costs. Cabanyal Estate does not charge the buyer an agency fee. Delivery is expected in April 2028, subject to the developer’s construction schedule. Contact us to request the floor plans, quality specifications and current availability, or to arrange a private visit.